An installed line may let a buyer see transfers, wiring and a representative run. Removal can free space for the next project but changes the proof the buyer can inspect. Before choosing, map what can be demonstrated, who handles removal and how the equipment will be documented and stored if it is dismantled first.
Compare the two commercial scopes
Identify the current production or shutdown dates, all shared modules and the last opportunity for a witnessed run. Keep the sale price separate from the cost of dismantling, lifting, packaging and storage. Record how photos and part labels will connect removed items to the agreed list.
| Decision | Sell installed | Sell after removal |
|---|---|---|
| Buyer demonstration possible | ___ | ___ |
| Packing, freight and storage scope | ___ | ___ |
| Evidence for interconnections and loose parts | ___ | ___ |
| Handover date and cost owner | ___ | ___ |
For a hypothetical comparison, an in-place offer of €80,000 with €4,000 of preparation leaves €76,000 before other costs. If removal first brings an offer of €88,000 and adds €15,000 in removal, packing and storage, the same comparison leaves €73,000. Put a date on each cash flow and add any cost of delaying the replacement project.
Build the seller dossier and describe what is included
Discuss the sale in both conditions
Share module list, last production date and planned timing for freeing the room.